Quantcast

Shrewsbury to open cooling station - abc27 WHTM

Shrewsbury to open cooling station

Posted: Updated:
SHREWSBURY, Pa. (WHTM) -

Shrewsbury will open its borough building as a cooling station Thursday and Friday for residents seeking relief from the heat.

The borough will provide an air conditioned room with metal chairs and tables, a drinking fountain and restroom facilities from 10 a.m. to 7 p.m. each day.

Residents should bring their own entertainment, food and snacks, and a soft chair if desired.

The room will be monitored by office staff from 10 a.m. to 4 p.m. and by volunteers from 4 p.m. to 7 p.m.

  • Most Popular StoriesMost Popular StoriesMore>>

  • Lower Paxton Township woman and neighbors see UFO

    Lower Paxton Township woman and neighbors see UFO

    Tuesday, August 26 2014 6:37 PM EDT2014-08-26 22:37:30 GMT
    Stephanie Wilkerson was enjoying a glass of wine on her porch Monday night when she looked up in the sky and saw something that caught her attention.More >>
    Stephanie Wilkerson was enjoying a glass of wine on her porch Monday night when she looked up in the sky and saw something that caught her attention.
    More >>
  • Dad builds sculpture for Penn State Hershey Children's Hospital

    Dad builds sculpture for Penn State Hershey Children's Hospital

    Tuesday, August 26 2014 6:32 PM EDT2014-08-26 22:32:52 GMT
    A father was so impressed by the care his son received at Penn State Hershey Children's Hospital that he built a sculpture.More >>
    A father was so impressed by the care his son received at Penn State Hershey Children's Hospital that he built a sculpture. More >>
  • Route 422 repairs in Palmyra could last even longer

    Route 422 repairs in Palmyra could last even longer

    Tuesday, August 26 2014 9:16 PM EDT2014-08-27 01:16:28 GMT
    The 3-month road project underway on Route. 422 in Palmyra could last even longer.Palmyra is undergoing a massive sinkhole problem throughout the area, and PennDOT is now working to install an underground bridge to better support the land under the road, and prevent those sinkholes from recurring.Now that crews have gotten down there and physically taken a look at the problem, they see it's worse than originally thought.PennDOT spokesperson Mike Crochunis says the support structure will have ...More >>
    The 3-month road project underway on Route. 422 in Palmyra could last even longer.Palmyra is undergoing a massive sinkhole problem throughout the area, and PennDOT is now working to install an underground bridge to better support the land under the road, and prevent those sinkholes from recurring.Now that crews have gotten down there and physically taken a look at the problem, they see it's worse than originally thought.PennDOT spokesperson Mike Crochunis says the support structure will have ...More >>
Powered by WorldNow